Epyllion Knitex Limited
 
   
         
   

FACTORY PROFILE

 
 

Factory Name:

Epyllion Knitex Limited

 
 

Address:

Jangaliapara (Bangla Bazar), Bhawal Mirzapur, Gazipur-1703

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Basic Information

Name of the Facility (As per license)

: Epyllion knitex Limited

Facility Address

: Jangaliapara (Bangla Bazar), Bhawal Mirzapur, Gazipur-1703.

Zip Code

: 1703

Name of the Owner

: Mr. Reaz Uddin Al-Mamoon

 

 

 

 

 

 

 

 

Factory Contact Persons

1. Name: Syed Sayeed Munir

Designation: C.O.O

Tel:

Cell: 01713004971

E-mail: gmsayeed@epylliongroup.com

2. Name: M.A. Hashem

Designation: DGM (HR, Admin & CSR)

Tel:

Cell: 01713423585

E-mail: hashem@epylliongroup.com

3. Name: Mohammad Jonayed Ahmed Jewel

Designation: DGM (Marketing &

Merchandising Department)

Tel:

Cell:01713423593

E-mail: jewel@epylliongroup.com

 

4. Name: Md. Sayed Hasan

Designation: DGM (Marketing &

Merchandising Department)

Tel:

Cell: 01730051883

E-mail: sayed.hasan@epylliongroup.com

 

Process (P)

PKnitting :

PDyeing :

PFinishing :

 

Years in Operation

: Jan'2003

Name of major buyer

: C&A, M&S, G-Star, Celio, H&M, S@Oliver, Original Marines & Next.

Number of Line/Table

:

Monthly Production Capacity

: 300 Ton

Full Time Doctor (Yes/No)

If yes (Registration Number)

: No

:A-70566

Full Time Nurse (Yes/No)

If yes (Certified or Not)

: No

:

Child Care With Wash Facility (Yes/No)

If yes (Capacity)

: Yes

:

Dining Area (Yes/No)

If yes (Seating Capacity of Dining Area)

: Yes

: 378

First Aid Box Quantity (Pcs)

: 06 (Pcs)

First Aider (Person)

: 30 Person

Any Welfare Committee/Association Workers Participation Committee (WPC)/ Workers Welfare Committee (WWC) formed? (Yes/No)

: We have Pc Committee.

If yes: Total Member: 12

Management: 06

Worker: 06

Building approval plan copy approved from RAJUK/Grihayon o Gonupurta Department (Yes/No)

: Yes

Building layout plan copy approved from Factory Inspector (Yes/No)

: Yes

Emergency Light with IPS backup

: Yes

Fire Fighter

Total : 256 Certified: 172

Fire Extinguisher (Total)

Fire Extinguisher (3 kg)

Fire Extinguisher (5/6 kg)

Fire Extinguisher (30 kg)

Total: 289

ABC: 25 CO2: 53 Foam:10kg 18

ABC: 146 CO2: 43 Foam:

ABC: 1 CO2:2 Foam:1

Numbers of Fire Equipments

Hose reel/Pipe: 25 Fire Alarm: 22

Fire Hook: 5 Fire Biter: 5

Bell: 0 Stretcher: 5

Gas Musk: 16 Blanket: 10

Hand Gloves: 12 Pairs Goggles:

Lock Cutter: 3 Belcha: 5

Water Dram: 60 Water Bucket:13

Smoke Detector: 35 Fire Alarm Switch: 17

Drinking Water Facility (Yes/No)

If yes (Capacity)

: Yes

: We have (07) water cooler Machine for EKL

Number of Complain Box

: 03

Number of Toilets

Male :22

Female : 02 Total : 24

Is there any contract workers (Yes/No)

If yes (How Many)

: No

:

 

 

Factory Premises

 

Total Land Area

: 277500 sft

 

Total Factory Area

: 110007.00sft

 

Total Numbers of Buildings

: 2

 

Total Numbers of Floors

: 2

 

Total Production area

:

 

Utility -1 (Generator Shade)

:

 

Utility-2 (Canteen Building)

:

 

ETP (Chemical)

:

 

Centralized fire detection system (Y/N)

: On Progress.

 

Fire hydrant system (Y/N)

: Yes

 

Water reserve tank (Y/N)

: 3,20,000 liter If yes (capacity):

 

Fire door status (Y/N)

: No

 

Number of Exits (Each Floor)

: 11

 

Total Knitting capacity

: 170 ton

 

Total Dyeing Capacity

: 300 ton

 

Eye wash station for print/spot room (Y/N)

: N/A

 

Total ETP Capacity

: 175 M3 per hour.

 

Total Packaging Area

:

 

Total Embroidery area

:

 

Total Embroidery capacity

:

 

Total Warehouse Area

:

 

Finished Goods Area

:

 

Needle Free Zone Area

:

 

Others (If Needed)

:

Working Hour & Payment System

 

Working Day Per Week

: 6 day

 

Normal Working Hour Per Day

: 8 hours

 

Over time Hour

: 2 Hours (If applicable)

 

Lunch Break

: 1hour

 

Number of Operating Shift (Details)

: 3 shift

 

Time keeping system (Manual/Punch)

: Punch

 

Pay Slip given (Yes/No)

: Yes

 

Payment period

: 7 Working day of the next month

 

Hand book available for worker (Y/N)

: No

 

Minimum wages

: 5300

 

         

 

Factories License & Certificate Statues

 

Sl NO

License Name

Available in factory

 

1

Factory License

Yes

 

2

Trade license

Yes

 

3

Fire license

Yes

 

4

Import Registration Certificate

Yes

 

5

Export Registration Certificate

Yes

 

6

Export Promotion Buru

 

 

7

Group insurance

Yes

 

8

Incorporation certificate

Yes

 

9

Boiler license

Yes

 

Boiler License

Yes

 

10

Boiler operator certificate

Yes

 

11

Generator using license from BERC

Applied

 

12

Acid license

Yes

 

13

Bonded warehouse certificate

Yes

 

14

Drinking water test report

Yes

 

15

Waste water test report

Yes

 

16

VAT Clearance Certificate

Yes

 

17

Income Tax Clearance Certificate

Yes

 

18

Environment Clearness Certificate

 

 

19

BGMEA/BKMEA/BTMA certificate

Yes

 

 

 

 

 

 

Manpower Status

Sl No

Category/Section

Male

Female

Total

1

Batch Preparation

29

 

29

2

HR, Admin & CSR

100

21

121

3

Finishing

77

 

77

4

Knitting

101

 

101

5

Dyeing

75

 

75

6

Operation

08

 

08

7

Lab

06

 

06

8

Quality

81

 

81

9

Maintenance

35

 

35

10

Supply Chain

00

 

00

11

PMC

02

 

02

12

MCD

58

 

58

13

Establishment

04

 

04

14

Finance & Accounts

00

 

00

15

Engineering

04

 

02

16

IE

02

 

02

17

IT

00

 

00

18

Marketing & Merchandising

00

 

00

Total

580

21

601

 

Machinery List

S/L

NAME OF MACHINE

TOTAL QTY

1.

Knitting (Circular with Flat) Machine

29

2.

Overhead Cleaner Machine

03

3.

Dyeing Machine

13

4.

Finishing Machine

09

5.

Weight Balance Machine

5

6.

Sewing Machine

07

7.

Final Inspection Machine

01

8.

ETP ( Chemical & Biological)

00

9

Air Turning

01

10

Grey Inspection

01

11

Utility Machine (Congested EKL with EFL)

20

12

Photo copy Machine

01

13

Laminating Machine

01

Total

92

 

 

Factory Status on the Basis of Compliance:

 

 

Name of the buyer/Third party/Authorized organization

Audit name

Audit Type

Status

Expired date

Remarks

C&A

Social

Follow-up

“B”

1st September 2018

 

 

Factory Status on the Basis of ACCORD:

 

 

Name of the buyer/Third party/Authorized organization

 

Audit name

Audit Number

Status

Expired date

Remarks

Accord

Fire Safety

Initial

Yellow

NA

 

 

Electrical

7th Follow-up

 

NA

 

 

Fire

7th Follow-up

 

NA

 

 

 

 

 

 

 

 

Environmental Status of the Year- 2016 (Textile Division)

 

Sl

Aspect

Scope

Total Consumption/ Emission

Remarks

 

1.

 

Energy Use

Electricity (REB + Generated) (KW)

18067173

 

Gas (m3)

13686306

 

Diesel (Ltr)

4383493

 

 

2.

 

Greenhouse Gas

GHG Emission (REB+Gas+Diesel) (Ton)

38661.351

 

Carbon Emission per kg Fabric Production (kg/kg Fabric)

3.78

 

 

3.

 

Waste Water

Waste Water Generation (Inlet) (m3)

992342

 

Waste Water Treatment (Outlet) (m3)

997335

 

Waste Water Generation per kg Fabric Production (ltr/per kg Fabric)

96.96

 

 

4.

 

 

Waste Generation

 

Non-Hazardous Waste Disposal (Ton)

2897.93

 

Hazardous Waste Disposal (Ton)

100.91

 

Waste Disposal per kg Fabric Production (kg/kg Fabric)

0.29

 

 
   

 
Group Overviews Backward Linkage Contact Us News & Events © 2005-2017 EPYLLION GROUP